T800 - TECHNO COLTER EPOXY |
100 % solid and solvent free epoxy-coal tar coating |
DESCRIPTION RECOMMENDED USE |
|
||||||
TECHNICAL INFO | |||||||
Density | :- 1.55 (mixed paint) temperature of 25°C, ASTM D-1475. | ||||||
Viscosity | :- High viscous. | ||||||
Solid content | :- 100 %(by volume(. ASTM D-5201 | ||||||
Spreading Rate | :- Theoretical spreading rate: 6.67 m²/L at D.F.T. 150 µ. | ||||||
MIXING RATIO | :- By volume: Base to hardener, 1 : 1. | ||||||
DRYING TIME | :- Dry to touch: 8 hours. | ||||||
Recoating Interval | : Minimum 24 hours. | ||||||
Maximum | : 7 days. | ||||||
Full Cure | : 7 Days. | ||||||
: All above drying time tested according to ASTM D-5895. | |||||||
THINNER | :- Not recommended. | ||||||
|
|||||||
APPLICATION GUIDE APPLICATION TOOLS PACKING SHELF LIFE |
SURFACE PREPARATION: STEEL: Remove oil and grease by suitable degreasing solution. Remove salt and other contaminants by high-pressure fresh water cleaning and followed by abrasive blasting minimum ISO 8501-1:1988 standard Sa ½. Apply two coats of (Epo Tar 100). CONCRETE: Concrete must be dry and free of dust and laitance. If surface is smooth, it must be made rough prior to application by power tool. Apply two coats of (Epo Tar 100). Airless Spray:- Nozzle size: 0.018” - 0.021”. Roller / Brush. 5 Ltr Can for base hardener 2 Ltr. In sealed container: 12 months in dry, cool, and well ventilated place. |
||||||
|
|||||||
www.technocoats.com |